Professional terms for making simulation dinosaurs

Jun 29, 2021

Leave a message

Terminology


This standard was jointly proposed by the Chinese Folk Lamp Culture Popularization Base, the Zigong City Lamp Trade Committee, and the Zigong City Lantern Chamber of Commerce.


1: Stakeout


It is also called hard ground lofting, which refers to the art drawing process of zooming in on the ground after shrinking the outline of the dinosaur to a certain extent according to the actual proportions of the construction drawings.


Note: ① Stakeout is required to be completed on a basically flat hard surface; ② Common tools for stakeout include tape measure, stone pen, line pen, ink, advertising paint, etc. ③ The stakeout process usually includes three steps: shaping (length and width), drawing (outline), and filling (outline).


2: Pick up samples


The process of using tools such as steel pliers, welding machines, etc., with flexible and tough metal such as iron wire or steel bar as the main talent, and welding on-site into a flat wire frame.


3: Dinosaur mechanical skeleton


The dinosaur mechanical skeleton is an internal bracket with a certain distance from the dinosaur skin and a certain shape welded by steel.


4: Transmission


The mechanical installation process of connecting the movement law of the internal skeleton of the dinosaur to the motor to produce the corresponding action.


Send Inquiry